FDP Form 10a- Bid Results on Civil Works
Republic of the Philippines
Province of Compostela Valley
Cabidianan, Nabunturan, Compostela Valley
BIDS AND AWARDS COMMITTEE
CIVIL WORKS BID- OUT
4th Quarter, CY-2018
No. |
Name of Project |
Approved Budget for Contract |
Location |
Winning Bidder |
Name and Address |
Bid Amount |
Bidding Date |
AWARDING DATE |
Contract Duration |
|
1. |
CW18-005 18-4668 |
1 lot: Construction of 2 units 12.LM X 24.45M Detention cell building for rehabilitation center, Nabunturan (furnishing Labor, Equipment and Materials) |
16,464,160.71 |
Nabunturan |
Three W Builders, Inc. |
Victotiano L. Ada – Laspiñas City, Metro Manila |
16,362,235.28 |
9.12.18 |
10.17.18 |
162 days |
2. |
CW18-011 18-C0570 LOT 1 |
LOT 1- DISTRICT I Construction of various tribal hall projects within district I (furnishing Labor, Equipment & Materials)
1.Poblacion, Monkayo –Construction of 5m x 6m Tribal Hall
2. Ngan, Compostela- Construction of 5m x 6m Tribal Hall |
1,932,844.11 |
*Pob. Monkayo
and
*Brgy. Ngan, Compostela |
Davao Santhony Builders Corporation |
Joel G. Baltazar – Carmen Davao del Norte |
1,915,1101.36 |
9.12.18 |
10.17.18 |
*60 days
*60 days |
3. |
CW18-013 18-C0615 LOT 2 |
LOT 2 –DISTRICT II Construction/Completion of MP builders at District II (furnishing labor, equipment & materials)
1.Const. of Elizalde ES Gym, Maco – Const. of 18m x 30m covered court
2.Const. of Panibasan NHS Gym, Maco- Const. of 18mx 30m covered court
3.Const. of Magnaga NHS Social Hall, Pantukan –Const. of One (1) Bay Social Hall
4.Const. of Napnapan Day Care Center, Pantukan-Const. of 7mx9m Day Care Center |
5,925,626.49 |
*Elizalde ES Gym, Maco
*Panibasan NHS Gym, Maco
*Magnaga NHS Social Hall, Pantukan
*Napnapan Day Care Center, Pantukan |
LLM Unified Builders & Trading Corp. |
Llewellyn L. Mangilet, Jr.- Prk.5 Tiburcia Kapalong, Davao del Norte |
5,910,862.98 |
9.12.18 |
10.17.18 |
*122 days
*122 days
*22 days
*71 days |
4. |
CW18-014 18-C0529 LOT 2 |
LOT 2 – Completion of Various covered court projects at Laak (furnishing labor, equipment & materials)
1.Completion of covered court, Sabud, Laak (Construction of Four (4) bay covered court (16mx24m) with overhang both sides, Installation of 127.8sq.m roofing and 510 sq.m concrete slab, topping, painting electrical and billboard)
2.Completion of covered court, Sto Niño, Laak (Const. of Two (2) Bays covered court with overhang both sides, repair of concrete flooring , Installation of One (1) bay roof frames, roofing Two (2) units steel fascia, painting, electrical and billboard)
3.Completion of covered court, Datu Ampunan, Laak (const. of Four (4) bays Covered Court with overhang both sides, concrete floor slab, embankment painting and billboard)
4.Completion of Covered Court, Bollucan, Laak (Const. of Four (4) Bays covered court with overhang both sides, concrete flooring, painting, Electrical and Billboard
5.Completion of covered court, Amorcruz, Laak (Construction of Two (2) Bays covered court with overhang both sides, concrete floor slab, painting electrical and billboard)
6.Completion of covered court, Mangloy, Laak (const. of Two (2) Bays covered court with overhang both sides concrete floor slab painting, electrical and billboard)
7. Completion of covered court, Longanapan, Laak (construction of Two (2) Bays covered Court with overhang both sides, concrete floor slab, painting, electrical and billboard)
8.Completion of covered court, Langtud, laak (construction of One(1) bay covered court 195.60sq.m concrete floor slab, painting electrical, gutter and billboard)
|
10,440,504.96 |
*Sabud, Laak
*Sto. Niño, Laak
*Datu Ampunan, Laak
*Bollucan, Laak
*Amorcruz, Laak
*Mangloy, Laak
*Longanapan, Laak
*Langtud, Laak
|
LLM Unified Builders and Trading Corp. |
Llewellyn L. Mangilet, Jr.- Prk.5 Tiburcia Kapalong, Davao del Norte |
10,383,634.27
|
9.12.18 |
10.17.18 |
*86 days
*58 days
*87 days
*78 days
*80 days
*56 days
*33 days
*37 days |
5. |
CW18-014 18-C0529 LOT 3 |
LOT 3 – Completion of various covered court projects at Mawab (furnishing labor, equipment & materials)
1.Completion of covered court, Saosao, Mawab (const. of Two (2) bays covered court with overhang both sides, concrete floor slab, painting, electrical and billboard)
2.Completion of covered court, Tuburan, Mawab (construction of Two (2) bays Covered Court with overhang both sides, concrete floor slab, painting, electrical and billboard)
3.Completion of covered court, Salvacion, Mawab (const. of One (1) bay covered court (18mx6m) with overhang 121.46sq.m concrete floor slab, 391.30sq.m concrete topping painting, electrical and billboard) |
2,409,046.42 |
*Saosao Mawab
*Tuburan Mawab
*Salvacion, Mawab |
LLM Unified Builders & Trading Corp. |
Llewellyn L. Mangilet, Jr.- Prk.5 Tiburcia Kapalong, Davao del Norte |
2,404,695.61 |
9.12.18 |
10.17.18 |
*45 days
*47 days
*39 days |
6 |
CW18-011 18-C0570 LOT 2 |
LOT 2 –DISTRICT II Const. of various Tribal Hall Projects within District II (Furnishing Labor, Equipment & Materials)
1.Poblacion Laak- Const. of 5m Tribal Hall
2.Bongbong, Pantukan – Const. of 5mx6m Tribal Hall
3.Poblacion Mabini- Const. of 5mx6m Tribal Hall |
2,929,887.45 |
*Pob. Laak
*Bongbong, Pantukan
*Pob. ,Mabini |
Davao Santhony Builders Corporation
|
Joel G. Baltazar – Carmen Davao del Norte |
2,900,355.00 |
9.12.18 |
10.31.18 |
*60 days
*60 days
*60 days |
7 |
CW18-014 18-C0529 LOT 1 |
LOT 1- Completion of various Covered Court Projects at Monkayo (Furnishing Labor, Equipment & Materials)
1.Completion of Covered Court, San Isidro, Monkayo (Const. of Two (2) bays covered court, with overhang both sides, Installation of 127.8sq.m roofing and 510 sq.m concrete slab, topping, painting, electrical and billboard)
2.Completion of covered court, Inambatan, Monkayo (const. of Two (2) bays covered court (18mx12m) with overhang both sides Installation of One (1) bay roofing repair of concrete slab flooring, painting, electrical and billboard)
3.Completion of covered court, Brgy. Haguimitan, Monkayo (const. of Two (2) bays covered court with overhang both side, Installation of 127.8sq.m roofing, painting, electrical and billboard) |
2,896,420.30
|
*San Isidro, Monkayo
*Inambatan, Monkayo
*Brgy. Haguimitan, Monkayo |
D.B Ravelo Construction and Supply |
Darwin B. Ravelo- Tagum City |
2,893,501.04 |
9.12.18 |
10.31.18 |
*55 days
*51 days
*56 days |
8. |
CW18-002 18-4362 REBID |
Upgrading / Improvement of Alegria-Panag-Camanlangan Provincial Road (Gabi-Panag Section) (Furnishing Labor, Equipment & Materials) |
25,811,614.00 |
Alegria-Panag-Camanlangan Provincial Road |
Legacy Construction Corporation |
Alex H. Abelido – Mancup Calasiao Pangasinan |
25,770,824.63 |
10.31.18 |
12.05.18 |
117 days |
9 |
CW18-003 18-4363 REBID |
Upgrading / Improvement of Compostela-Tubo-Tubo-Monkayo Provincial Road with Bridge Component (furnishing Labor, Equipment & Materials) |
125,500,000.00 |
Compostela-Tubo-Tubo-Monakyo Provincial Road |
FFJJ Construction |
Osmeña L. Palanggalan- Notredame Cotabato City |
125,459,975.18 |
10.31.18 |
12.05.18 |
217 days |
10. |
CW18-004 18-4364 |
Upgrading / Improvement of Libay-Libay-New Visayas-Sangab-Limbo Provincial Road with Bridge Component (Furnishing Labor, Equipment & Matrials) |
33,800,000.00 |
Libay-Libay-New Visayas-Sangab-Limbo Provincial Road
|
Alonzo Construction |
Napoleon M. Alonzo- Km. 5 Matina Pangi, Davao City |
33,724,433.46 |
10.31.18 |
12.05.18 |
146 days |
11. |
CW18-017 18-5206 |
1 Lot: Well Drilling, Installation of solar power pump with motor control, construction of 4.0m x 4.0m x4.0m concrete tank elevated at 6.0m height and 9 units Tapstand for potable water system at Brgy. Tamia, compostela (Furnishing Labor, Equipment at Materials) |
5,000,000.00 |
Brgy. Tamia, Compostela |
Ancor Water Resources |
Andress P. Gentugaya- Tagum City |
4,983,397.41 |
10.31.18 |
12.05.18 |
231 days |
12 |
CW18-018 18-6909 |
1 Lot : Concreting of Road from Purok 3 to Purok 6 Brgy. Mainit, Nabunturan (furnishing labor, equipment & materials) |
8,208,501.76 |
Prk 2 & 6 Brgy, Mainit, Nabunturan |
Mark Anthony Construction Supply |
Mark Anthony Castro Cayetano – Davao City |
8,183,566.86 |
10.31.18 |
12.05.12 |
93 days |
13 |
CW18-015 18-C0617 LOT 1 |
Const. of Improvement of water system for various Brgy. Within the Municipality of Compostela (Furnishing Labor, Equipment & Materials)
1.Prk.Candaga, Mangayon, Compostela (Installation of 2,432.51 meters distribution lines for water pipelines and 2.5m and 2.5m x2.5m concrete ground tank)
2.Ngan, Compostela (Installation of 1,500.00 meters transmission line & 7,000.00 meters distribution lines for water pipelines and 6.0mx6.0mx3.0m concrete ground tank)
3.Prk. 6 Mangayon, Compostela (Installation of 60.00 meters transmission lines & 525.00 meters distribution lines for water pipelines, well drilling and pump with motor control.
4.Osmeña, Compostela (installation of 3,000.00 meters distribution lines for water pipelines and 3.5mx 3.5m x 3.5m concrete ground tank. |
14,844,536.71
|
*Prk. Candaga, Mangayon, Compostela
*Ngan, Compostela
*Prk. 6 Mangayon, Compostela
*Osmeña, Compostela
|
Two Degrees Construction Supply |
Katty M. Lacaba – Pag-ibig Sa Buhangin Subdivision- Davao City, Davao del Sure |
14,838,758.40 |
11.21.18 |
12.19.18 |
*120 days
*222 days
*119 days
*150 days |
14. |
CW18-023 18-6857 |
1 Lot: Const. of 8ln.m foot bridge for Binuangan, Maco, Gawad Kalingan Village (furnishing labor, equipment & materials) |
716,029.83 |
Binuangan, Maco Gawad Kalinga Village |
Kanaway Builders Corp. |
Conzado D. Magat Jr. –Prk. Café Nat;l Highway Visayan Village, Tagum City |
715,134.42 |
11.21.18 |
12.19.18 |
56 days |
We hereby certify that we have reviewed the contents and hereby attest to
the veracity and correctness of the data or information contained in this
document.
SGD.ARMANDO G. ATAKE SGD.DR. ROLANDO S. SIMENE,DVM SGD. VIRGILIA S. ALLONES SGD.ENGR. RODERICK M. DIGAMON,CE SGD. DR. NEIL P. ESTOYA,MD
BAC-Chairperson Vice-Chairman Member Member Member